top of page

ROADMAP OF AROMACORE

785e2fc746412f54ac0beb9405bf7716.png

Development Status:

AromaCore is currently at the Engineering Prototype (EVT) stage.
We’re preparing the final version of the device, mobile app, and certification.
Funds raised from the campaign will be used for final refinement, integration, and production launch.

PROJECT BUDGET

We’re fully transparent about how the campaign funds will be allocated.
Every contribution brings AromaCore closer to serial production and certification.

Development Status

Current stage: Engineering Validation Test (EVT).
We have a physical engineering prototype demonstrating the core construction and main functional elements of the device.

 

What has already been completed:

  • Mechanical design

  • Air-channel system

  • Cartridge mechanism

  • Heating module

  • UX/UI design of the application


Next steps:

  • Building the final prototype (DVT)

  • Integration of electronics and firmware

  • Certification: CE/RoHS for the device, IFRA/SDS for the oils

  • Pilot production (PVT)

  • Preparation for mass manufacturing


Software:

The full mobile application will be developed after the campaign.
It will include schedule control, cartridge-level monitoring.

bottom of page